

Stack Fold Planter AIG Harness
JDH26026
Implement harness for John Deere Active Implement Guidance (AIG) on 3-point linkage hilling implements fitted with hydraulically steerable coulters
RRP
$ 1,307.59 AUD (ex GST)
Approx. US$000.00
Prices exclude shipping. International duties, taxes and other destination charges may apply.
About
Keep the implement on the row, not just the tractor.
Even when the tractor is tracking accurately, a 3-point linkage implement can move off-line behind it. Changes in soil conditions, coulter wear, bearing condition, tyre pressures and other factors can all influence how the implement tracks through the paddock.
The AgriStag Active Implement Guidance (AIG) Hilling Harness is designed for hilling implements fitted with hydraulically steerable coulters and using tractor-mounted John Deere Active Implement Guidance.
The steerable coulters effectively act as a steerable axle for the implement, using tillage discs rather than tyres. Hydraulic control adjusts the coulter angle to counteract implement movement, allowing Active Implement Guidance to keep the hilling implement aligned with the intended path independently of small movements behind the tractor.
Our harness provides the implement-side connections required to bring the ISOBUS connection, implement receiver and two feedback sensors together in a purpose-built configuration for this application.
Compatibility
Designed for:
- 3-point linkage hilling implements
- Hydraulically steerable coulter systems
- Tractor-mounted John Deere Active Implement Guidance
- John Deere UCC and UCC2 systems
The same harness is suitable for both generations of John Deere Universal CAN Controller, so you don't need to specify whether your system uses a UCC or UCC2 when ordering.
Fitment & Routing
The standard harness configuration incorporates:
- 5.3 m lead to the ISOBUS connector
- Receiver connection positioned to suit a 60 cm implement receiver tower
- Two feedback sensor connections, each with 55 cm leads
The harness is designed around the physical layout of a 3-point linkage hilling implement, keeping the AIG connections together in a purpose-built implement harness.
Lead Time
Built to order. Current lead times vary depending on our production schedule, order quantity, build complexity and parts availability. We’ll confirm the estimated lead time with your quote, before you place your order.
Discounts, Returns & Refunds
We're not your typical online store!
We're a small, family-run Aussie business making products to order, not pulling them off a shelf. Have a question, need something a little different, or ordering a few things at once? Get in touch! We love helping customers find the right solution and can often offer a better deal when bundling products.
_edited_edited_edited.png)
